07.03.2018

Paris Grand Paris and related sites, SIXENSE Soldata puts its shoulder to the wheel

Having participated in the monitoring of the majority of the recent tunneling projects in France (Toulon South Tunnel, Emergency Gallery for the Fréjus Tunnel, Tunnel descending to Monaco, Tunnel of Saverne, Metro Line B in Lyon, Metro Line B in Rennes and Nice Tramline, the last two still ongoing), SIXENSE Soldata is to intervene on different contracts comprising the Grand Paris project.

Having already carried out a significant amount of monitoring and instrumentation work on many of the Grand Paris Projects, SIXENSE Soldata is deploying a variety of sensor technologies for Eole Preliminary Monitoring, Eole La Défense, Eole Tunnel, Line 14 North Lots 1, 2 and 3, Preliminary Monitoring for Line 15 South, L15 South lots 2A, 2C and 2D, Line 11 GC2 and Goncours Station, Line 12 Aubervilliers and Line 4 Bagneux.

The systems installed, maintained and operated include the motorised CYCLOPS and CENTAUR total station systems, Atlas satellite interferometry measurement, inclinometres, piezometers, extensometers, crackmetres, geophones (vibrations), manual topography, GPS 4DBlocs systems, SAA, temperature measurement systems, etc. all the data is managed using our Geoscope software.

SIXENSE Soldata strives at all times to deliver quality data and a high level of service to our clients.

All our news